The hour before doors open. Handled.

One message in, your whole week out. Prep timeline, gram weights, shopping run, and a board that runs service.

The drop composer: counts on the left, and the backward timeline, difference and shopping list it compiles.
Doors
7:00 PM
Units
43
Tasks
10
Warnings
1

Read off the compile in the screenshot above.

Counts in, the whole week out.

Give it a door time and the counts. It schedules every mix, rest and prep task backward from service, with gram weights and start times, on a workspace shaped to your shop.

The workspace with Nane open: a tenant-configured sidebar on the left, and on the right a change Nane has proposed to the app, with Approve and Reject.

A board that runs the night.

Window intake, fire queue, oven timers on absolute timestamps, and stock that 86s itself at zero. It keeps taking orders when the Wi-Fi drops.

The night board: dough counters, six oven slots with countdowns, and the fire queue on a dark kiosk screen.

NANE

Nane proposes. You approve.

It reads your shop, drafts the change, and shows you the diff. Nothing reaches a customer or a count without you saying yes.

Nane proposes

Workspace change

proposed
  • Add view "Saturday prep" with 4 blocks
  • Move "Dough counts" above "Oven map"
  • Add it to the sidebar under Service

Saturday is your biggest door and the prep list is read on a phone at the bench.

sidebarsaturday-prep
Example. Approve and Reject are shown here but do nothing.

The parts you should not have to think about.

Counts are a log, not a number.

Every sale, spoil and recount is appended. You can still ask what the count was at 6:40 PM last Saturday.

Timers hold real times.

A tablet that sleeps through a rush wakes up showing the right pull time, not a stale countdown.

Texts go out on consent.

Every customer message runs through one consent-checked path. There is no way around it.

Nothing changes without you.

Nane proposes, you approve, and the workspace it publishes is a version you can go back to.

Set it up once. It compiles every week after that.

Open the app